Quadra-Fire 7100FP Bedienungshandbuch Seite 24

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 36
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 23
After re-installing the timer assembly through the
reboxaccessdoor,re-attachthetimerassemblyto
theairchambercoverusingaPhillipsheadscrew
driver.
SeeFigure4.19.
• Attach the linkageupperarmtothelower linkage
arm.
• Installnewtimerusingsametwoscrews.Itisvery
important that the D cut side of the timer shaft is
facing the opposite side of the linkage timer arm.
SeeFigure4.22.
Remove Timer
Loosen Set Screw
Remove
2 screws
7. Timer Removal & Replacement
• Loosensetscrewontimer,removetwoscrewsand
removetimer.SeeFigure4.21.
Figure 4.20 Timer Box Installed
D cut side of timer shaft must face
away from the Linkage Timer Arm
• Placelinkagecontrolarmovertimershaftandtighten
setscrew,Figure4.23.
Tighten set screw
Figure 4.23 Linkage Control Arm Installed
• Rotate linkage control arm into nal position and
re-attachtomountingplate.NotethattheDcutisnow
facingthelinkagetimerarm.Re-attachthelinkage
timerarm,Figure4.23.
• Retun toTimerAssembly Replacement, Section
4.B.6.
Figure 4.22 D Cut on Shaft
Figure 4.21 Timer
24
Quadra-Fire • 7100 FP Owner’s Manual • 433-3600 • Rev G • 06/25/14
Seitenansicht 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 35 36

Kommentare zu diesen Handbüchern

Keine Kommentare