Quartet FrontSolitaire Frontwww.quadrafi re.com January 28, 2008250-7233F RTested andListed byBeavertonOregon USAOMNI- Test Laboratories, Inc.CUSDO
Page 10 January 28, 2008Quadra-Fire · Sapphire · 250-7233F5Vent InformationA. Venting ComponentsB. Use of ElbowsIn order to comply
January 28, 2008Page 11Quadra-Fire · Sapphire · 250-7233ED. How to Use the Vent Graph E. Venting GuidelinesNOTE: IF YOUR INSTALLATION FALLS WITHIN
Page 12 January 28, 2008Quadra-Fire · Sapphire · 250-7233FFemale Locking LugsMale Locking LugsStep 1. Determine the desired locatio
January 28, 2008Page 13Quadra-Fire · Sapphire · 250-7233ENOTE:(1) Installation requires a minimum of 11 in. (279mm) horizontal run. Each 1 ft. (3
Page 14 January 28, 2008Quadra-Fire · Sapphire · 250-7233FStep 5. Place the wall thimble cover over the pipe assembly and slide th
January 28, 2008Page 15Quadra-Fire · Sapphire · 250-7233EStep 1. Check the installation instructions for required 1 in. (25mm) clearances (air spa
Page 16 January 28, 2008Quadra-Fire · Sapphire · 250-7233FStep 4. Assemble the desired lengths of pipe and elbows necessary to reac
January 28, 2008Page 17Quadra-Fire · Sapphire · 250-7233EMIN. 1 in. (25mm)CLEARANCECEILING FIRES TOPNAILSMIN. 1 in. (25mm)CLEARANCEMIN. 1 in. (25m
Page 18 January 28, 2008Quadra-Fire · Sapphire · 250-7233F2. Cathedral CeilingLEVELCATHEDRAL CEILINGSUPPORT BOX2 in. (51mm)MIN. BEL
January 28, 2008Page 19Quadra-Fire · Sapphire · 250-7233EHIGH WINDTERMINATIONCAPSHEET METALSCREWSDRILL FOUR 1/8 in.(3mm) DIAMETERHOLESFigure 5.21
Page 2Quadra-Fire · Sapphire · 250-7233F January 28, 2008Hearth & Home Technologies welcomes you to our tradition of excellence! In choosing
Page 20 January 28, 2008Quadra-Fire · Sapphire · 250-7233F4. Existing Masonry ChimneyType A - Up & Out Installations for Top Ve
January 28, 2008Page 21Quadra-Fire · Sapphire · 250-7233E10 in. x 10 in. (254mm x 254mm)FRAMED OPENING IN WALLSTUDWALLMASONRYCHIMNEYRETRO CONNECTO
Page 22 January 28, 2008Quadra-Fire · Sapphire · 250-7233FHIGH WINDTERMINATIONCAPTOP ADAPTERTHREE SHEETMETAL SCREWSFLASHINGStep 9.A
January 28, 2008Page 23Quadra-Fire · Sapphire · 250-7233E6Gas InformationA. Fuel ConversionsBefore making gas connections ensure that the applian
Page 24 January 28, 2008Quadra-Fire · Sapphire · 250-7233FABCFigure 6.6 Turn control knob to the OFF position, ensure that gas su
January 28, 2008Page 25Quadra-Fire · Sapphire · 250-7233EFire Risk.Explosion Risk.• If the information in these instructions is not followed exac
Page 26 January 28, 2008Quadra-Fire · Sapphire · 250-7233F• A small amount of air will be in the gas supply lines. When fi rst light
January 28, 2008Page 27Quadra-Fire · Sapphire · 250-7233E7Electrical InformationA. Recommendation for WireC. Standing Pilot Ignition System Wiri
Page 28 January 28, 2008Quadra-Fire · Sapphire · 250-7233FFigure 7.1CAUTIONLabel all wires prior to disconnection when servicing co
January 28, 2008Page 29Quadra-Fire · Sapphire · 250-7233E8Appliance SetupA. Remove Shipping MaterialsRemove shipping materials from inside or und
Page 3Quadra-Fire · Sapphire · 250-7233F- TABLE OF CONTENTS - January 28, 2008Section 1: Listing and Code Approvals A. Appliance Certifi cations
Page 30 January 28, 2008Quadra-Fire · Sapphire · 250-7233FFigure 8.4 Install the inner fl ue collar on rear of appliance, with damp
January 28, 2008Page 31Quadra-Fire · Sapphire · 250-7233EFigure 8.9 Remove burner by sliding the shutter to the right, lifting up the left side o
Page 32 January 28, 2008Quadra-Fire · Sapphire · 250-7233FE. Front Installation Figure 8.13 To remove the face, loosen the thumb
January 28, 2008Page 33Quadra-Fire · Sapphire · 250-7233EF. Hearth Legs InstallationRefer to Section 12 for specific color part numbers.Hearth le
Page 34 January 28, 2008Quadra-Fire · Sapphire · 250-7233FH. Mineral Wool• Follow ember placement instructions in manual.• Do NO
January 28, 2008Page 35Quadra-Fire · Sapphire · 250-7233ENOTE: This blower utilizes a snap disc to control ON and OFF operation. When the correct
Page 36 January 28, 2008Quadra-Fire · Sapphire · 250-7233FSNAPDISC6 in. (152mm) BLACKBLOWER4 in. (102mm) WHITECORDMFMF34 in. (864mm
January 28, 2008Page 37Quadra-Fire · Sapphire · 250-7233ESee vent graph for recommendations on page 11 before you begin your adjustment. If your
Page 38 January 28, 2008Quadra-Fire · Sapphire · 250-7233F9Operating InstructionsA. Before Lighting ApplianceRead this entire manu
January 28, 2008Page 39Quadra-Fire · Sapphire · 250-7233EC. Lighting Appliance1. Set the thermostat to lowest setting. 2. Turn off all electric
Page 4 January 28, 2008Quadra-Fire · Sapphire · 250-7233F1Listing and Code ApprovalsThe product is listed to ANSI standards for “Ve
Page 40 January 28, 2008Quadra-Fire · Sapphire · 250-7233FD. After Appliance is LitWhen you light your appliance, you may notice t
January 28, 2008Page 41Quadra-Fire · Sapphire · 250-7233E10TroubleshootingWith proper installation, operation, and maintenance your gas appliance
Page 42 January 28, 2008Quadra-Fire · Sapphire · 250-7233FSymptom Possible Cause Corrective Action3. (Continued) c. Defective val
January 28, 2008Page 43Quadra-Fire · Sapphire · 250-7233E11Maintaining and Servicing ApplianceAlthough the frequency of your appliance servicing a
Page 44 January 28, 2008Quadra-Fire · Sapphire · 250-7233FInspect Maintenance TasksDoors 1. Inspect for scratches, dents or other
January 28, 2008Page 45Quadra-Fire · Sapphire · 250-7233EB. Service and Maintenance LogDate of Service Performed By Description of Service
Page 46 January 28, 2008Quadra-Fire · Sapphire · 250-7233F12Reference MaterialsA. Appliance Dimension DiagramDimensions are actual
January 28, 2008Page 47Quadra-Fire · Sapphire · 250-7233EB. Vent Components DiagramFigure 12.2 SL-D Series Vent Components4 in. (102 mm) inner
Page 48 January 28, 2008Quadra-Fire · Sapphire · 250-7233FC. Vent Components List COMPONENTS930D Ceiling Support / Wall Thimble, Bl
January 28, 2008Page 49Quadra-Fire · Sapphire · 250-7233ED. Service Parts ListR SAPPHIRE(NG, LP) Exploded Parts DiagramBeginning Manuf
January 28, 2008Page 5Quadra-Fire · Sapphire · 250-7233ENOTE: The following requirements reference various Massachusetts and national codes not co
Page 50 January 28, 2008Quadra-Fire · Sapphire · 250-7233FItem #Part DescriptionAlphabetical OrderSKUAdapter, DV 7000-16218 Adapter
January 28, 2008Page 51Quadra-Fire · Sapphire · 250-7233EItem #Part DescriptionAlphabetical OrderSKUIMPORTANT: THIS IS DATED INFORMATION. The mos
Page 52 January 28, 2008Quadra-Fire · Sapphire · 250-7233FIMPORTANT: THIS IS DATED INFORMATION. The most current information is lo
January 28, 2008Page 53Quadra-Fire · Sapphire · 250-7233EF. Warranty PolicyLifetime WarrantyRLIMITED LIFETIME WARRANTYThe Hearth & Home Techn
Page 54 January 28, 2008Quadra-Fire · Sapphire · 250-7233FTHIS PAGE INTENTIONALLY LEFT BLANK.
January 28, 2008Page 55Quadra-Fire · Sapphire · 250-7233ETHIS PAGE INTENTIONALLY LEFT BLANK.
Page 56Quadra-Fire · Sapphire · 250-7233F January 28, 2008 Hearth & Home Technologies1445 North HighwayColville, WA 99114Division of HHT INDU
Page 6 January 28, 2008Quadra-Fire · Sapphire · 250-7233F2Getting StartedCheck building codes prior to installation.• Installation
January 28, 2008Page 7Quadra-Fire · Sapphire · 250-7233E3Appliance Location and ClearancesA. Selecting Appliance LocationNOTE: · Illustrations re
Page 8 January 28, 2008Quadra-Fire · Sapphire · 250-7233F4Termination LocationsA. Vent Termination Minimum Clearances24 in. (610mm)
January 28, 2008Page 9Quadra-Fire · Sapphire · 250-7233EFigure 4.4 V= VENT TERMINALX= AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTEDA =
Kommentare zu diesen Handbüchern